Tuas Power Biomass Conversion Project
Sector: Power Generation (CCGT) • Location: Singapore
Source: Reuters
Singapore's Tuas Power aims to operate its 133 MW coal-fired power plant fully on biomass by 2028.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Biomass
- Location
- Singapore
- Updated
- 22 Jul 2026
- Source
- Reuters
ConstructChat
Ask ConstructChat about Tuas Power Biomass Conversion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Singapore's Tuas Power aims to operate its 133 MW coal-fired power plant fully on biomass by 2028. |
Original sector | Energy |
Location
Country | Singapore |
Source
Source | Reuters |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Biomass |
Article published date | 2025-11-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Singapore
- Jurong Rock Cavern Phase 1 - Stage 2
- Khoo Teck Puat Hospital
- Phoenix Solar Thin Film Photovoltaic Plant
- UWCSEA Solar Thermal Energy Plant
- Jurong Island CCGT Plant
- North-South Transmission Cable Tunnel Contract NS3
- Pulau Seraya Combined Cycle Power Plant Block III
- Pulau Seraya Combined Cycle Power Plant Block IV
