Tubaté solid waste plant PPP project
Sector: Water Supply and Storage • Location: Brazil
Source: InfraPPPWorld
The consortium will be responsible for tasks ranging fromstreet cleaningto the collection and disposal of household and industrial waste, and the construction ofwaste recycling plants.Taubaté currently generates 1,000 t/d of waste.
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Biomass, Waste Processing and Treatment
- Location
- Brazil
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Tubaté solid waste plant PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | project awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The consortium will be responsible for tasks ranging fromstreet cleaningto the collection and disposal of household and industrial waste, and the construction ofwaste recycling plants.Taubaté currently generates 1,000 t/d of waste. |
Original sector | Water & Waste |
Procurement method | |
Budget |
Location
Country | Brazil |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Biomass, Waste Processing and Treatment |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
