logo
ProjectProject Awarded

Tubaté solid waste plant PPP project

Sector: Water Supply and Storage • Location: Brazil

Source: InfraPPPWorld

The consortium will be responsible for tasks ranging fromstreet cleaningto the collection and disposal of household and industrial waste, and the construction ofwaste recycling plants.Taubaté currently generates 1,000 t/d of waste.

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Biomass, Waste Processing and Treatment
Location
Brazil
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Tubaté solid waste plant PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tubaté solid waste plant PPP project” is an infrastructure initiative in the Water Supply and Storage sector, located in Brazil. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Company

Status

Original status

project awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The consortium will be responsible for tasks ranging fromstreet cleaningto the collection and disposal of household and industrial waste, and the construction ofwaste recycling plants.Taubaté currently generates 1,000 t/d of waste.

Original sector

Water & Waste

Procurement method

Budget

Location

Country

Brazil

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Biomass, Waste Processing and Treatment

Article published date

2025-03-02

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project