Tucurui-Presidente Dutra Transmission Line
Sector: Commercial • Location: Sao Paulo, Brazil
Source: World Bank Group
The transmission project comprises a 500Kv transmission line connecting Tucurui, Maraba, Acailandia, Imperatriz, and Presidente Dutra substations. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered the line through a public bid and a consortium comprising Alusa and Schanin was the winner. After the public bid, a new company, Empresa Amazonense de Transmissão de
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Government
- Location
- Sao Paulo, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tucurui-Presidente Dutra Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The transmission project comprises a 500Kv transmission line connecting Tucurui, Maraba, Acailandia, Imperatriz, and Presidente Dutra substations. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered the line through a public bid and a consortium comprising Alusa and Schanin was the winner. After the public bid, a new company, Empresa Amazonense de Transmissão de Energia S.A (EATE), was created to built and operate the lines. EATE comprises Alusa, Schahin, and Eletrobras, a Brazilian state-owned company. By 2006, the project ownership was Alusa 27.43%, Eletrobrás 45.14%, Cemig 13.72% and Brascan 13.72%. The contract between ANEEL and EATE was signed in June 2001 and will be valid until June 2031. According to the contract, the line were expected to start operating within 22 months of signature. The line was inaugurated within the contractual deadline. The project reached financial closure in March 2002, when Brazil’s development Bank, BNDES, approved financing of US$209 millions (R$488 millions) for the project. The financing corresponds to 78.75 percent of the total investments of US$266 million (R$619 million). The total length of the line, from substation Tucurui to substation Presidente Dutra, was expected to be 942 KM. In addition to building and operating the transmission line, the project also comprises the construction of Acailandia substation and the expansion of the other substations involved. The project will increase the interconnection between the North and the Northeast regions. This project is the third section of the interconnection project linking these two regions. By 2009, the project ownership was Alusa 29%, Eletrobrás 40.2%, Cemig 14.9% and Brascan 14.9%. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Sao Paulo |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Power Transmission, Manufacturing (Industrial), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia