Tucurui-Presidente Dutra Transmission Line

Sector: Power Transmission • Location: Brazil

Source: World Bank Group

Project
Active

The transmission project comprises a 500Kv transmission line connecting Tucurui, Maraba, Acailandia, Imperatriz, and Presidente Dutra substations. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered the line through a public bid and a consortium comprising Alusa and Schanin was the winner. After the public bid, a new company, Empresa Amazonense de Transmissão de

Project Information FAQ

Project Information

4 Q
The project “Tucurui-Presidente Dutra Transmission Line” is an infrastructure initiative in the Power Transmission sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The transmission project comprises a 500Kv transmission line connecting Tucurui, Maraba, Acailandia, Imperatriz, and Presidente Dutra substations. ANEEL, the Brazilian independent regulatory agency for the electricity sector, offered the line through a public bid and a consortium comprising Alusa and Schanin was the winner. After the public bid, a new company, Empresa Amazonense de Transmissão de Energia S.A (EATE), was created to built and operate the lines. EATE comprises Alusa, Schahin, and Eletrobras, a Brazilian state-owned company. By 2006, the project ownership was Alusa 27.43%, Eletrobrás 45.14%, Cemig 13.72% and Brascan 13.72%. The contract between ANEEL and EATE was signed in June 2001 and will be valid until June 2031. According to the contract, the line were expected to start operating within 22 months of signature. The line was inaugurated within the contractual deadline. The project reached financial closure in March 2002, when Brazil’s development Bank, BNDES, approved financing of US$209 millions (R$488 millions) for the project. The financing corresponds to 78.75 percent of the total investments of US$266 million (R$619 million). The total length of the line, from substation Tucurui to substation Presidente Dutra, was expected to be 942 KM. In addition to building and operating the transmission line, the project also comprises the construction of Acailandia substation and the expansion of the other substations involved. The project will increase the interconnection between the North and the Northeast regions. This project is the third section of the interconnection project linking these two regions. By 2009, the project ownership was Alusa 29%, Eletrobrás 40.2%, Cemig 14.9% and Brascan 14.9%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data