Tulalip Tribes Utility Building
Sector: Automotive • Location: Tulalip Bay, Washington, United States of America
Source: Dodge USA
The Utility Building project will include the construction of a 2-story wood-framed building of approximately 7,800 sf. The program includes wastewater testing laboratory, vehicle maintenance bays, materials (pipe) storage, office space, conference rooms, restrooms, employee break and kitchenette. Project also includes associated site and utilities work, mechanical, electrical and plumbing work. T
- Status
- Closed
- Sector
- Automotive, Warehouse, Commercial, Power Transmission, Residential, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT)
- Location
- Tulalip Bay, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tulalip Tribes Utility Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Utility Building project will include the construction of a 2-story wood-framed building of approximately 7,800 sf. The program includes wastewater testing laboratory, vehicle maintenance bays, materials (pipe) storage, office space, conference rooms, restrooms, employee break and kitchenette. Project also includes associated site and utilities work, mechanical, electrical and plumbing work. The project is located on the Tulalip Reservation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Tulalip Bay |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Warehouse, Commercial, Power Transmission, Residential, Water Supply and Storage, Waste Processing and Treatment, Power Generation (CCGT) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
