Tulare City Widening
Sector: Car parking • Location: CA, United States of America
Source: US Department of Transportation (USDOT)
Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes to widen State Route 99 in the City of Tulare from just south of Avenue 200 Overcrossing to just north of Prosperity Avenue Overcrossing (post miles 25.4/30.6). One lane would be constructed in each direction in the existing freeway median to create a six-lane free
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Other Agencies with Actions or Authorizations: California Description: The California Department of Transportation (Caltrans) proposes to widen State Route 99 in the City of Tulare from just south of Avenue 200 Overcrossing to just north of Prosperity Avenue Overcrossing (post miles 25.4/30.6). One lane would be constructed in each direction in the existing freeway median to create a six-lane freeway, divided by a concrete median barrier. The existing lanes and shoulders of mainline State Route 99, as well as the ramps would be rehabilitated. A second lane would be added to the northbound and southbound Bardsley Avenue onramps. Ramp metering would be added at these interchanges: Paige Avenue, Bardsley Avenue, Tulare Avenue (State Route 137), and at the Prosperity Avenue northbound onramp and Hillman Street northbound onramp. North of the Avenue 200 Overcrossing, the existing southbound lanes would be realigned to adjoin the existing northbound lanes for a distance of about three-quarters of a mile (post miles 25.62 to 26.35) in order to eliminate a non-standard curve. Four new drainage basins are proposed. In addition, the existing Paige Avenue Interchange would be reconstructed to a tight diamond layout with roundabouts at the ramp ends. Two additional roundabouts would be constructed on Paige Avenue at Blackstone Street and Laspina Street. The Paige Avenue Overcrossing would be replaced with a wider structure with two lanes in each direction and a pedestrian/bicycle shared path on both sides. A new driveway is proposed for the Tulare Inn Mobile Home Park. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
