logo

Tulu Moye Geothermal Project

The owner, status and timeline of this project. A free account opens every field.

Source: Africa Oil+Gas Report

Project
Under Construction

The Tulu Moye Geothermal Project in Ethiopia aims to develop a 150-MW geothermal power plant, with Phase 1 generating up to 50 MW. The project is backed by a power purchase agreement with Ethiopian Electric Power and has received increased guarantees from the World Bank's MIGA.

Status
Under Construction
Sector
Oil and Gas, Power Generation (CCGT), Geothermal
Location
Ethiopia
Updated
22 Jul 2026
Source
Africa Oil+Gas Report

ConstructChat

Ask ConstructChat about Tulu Moye Geothermal Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tulu Moye Geothermal Project” is an infrastructure initiative in the Oil and Gas sector, located in Ethiopia. Taiyo aggregates data on it from Africa Oil+Gas Report.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Tulu Moye Geothermal Project in Ethiopia aims to develop a 150-MW geothermal power plant, with Phase 1 generating up to 50 MW. The project is backed by a power purchase agreement with Ethiopian Electric Power and has received increased guarantees from the World Bank's MIGA.

Original sector

Energy

Budget

Location

Country

Ethiopia

Source

Source

Africa Oil+Gas Report

URL

More Details

Record type

Project

Sector

Oil and Gas, Power Generation (CCGT), Geothermal

Article published date

2025-05-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project