Tulu Moye Geothermal Project

Sector: Geothermal • Location: Ethiopia

Source: Multilateral Investment Guarentee Agency (MIGA)

Project
Proposed

Project Description On March 10, 2021, MIGA issued a guarantee for US$67.5 million to Tulu Moye SAS of France to cover its equity and quasi-equity investments in Tulu Moye Geothermal Operations Plc of Ethiopia against the risks of Breach of Contract, Expropriation and War and Civil Disturbance for a period of up to 15 years.   Tulu Moye SAS is jointly owned by Meridiam SAS of France and Reykjavik

Project Information FAQ

Project Information

5 Q
The project “Tulu Moye Geothermal Project” is an infrastructure initiative in the Geothermal sector, located in Ethiopia. Taiyo aggregates data on it from Multilateral Investment Guarentee Agency (MIGA).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

proposed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project Description On March 10, 2021, MIGA issued a guarantee for US$67.5 million to Tulu Moye SAS of France to cover its equity and quasi-equity investments in Tulu Moye Geothermal Operations Plc of Ethiopia against the risks of Breach of Contract, Expropriation and War and Civil Disturbance for a period of up to 15 years.   Tulu Moye SAS is jointly owned by Meridiam SAS of France and Reykjavik Geothermal Ltd. of Iceland.  In this project, MIGA will share a first loss layer with the IDA Private Sector Window MIGA Guarantee Facility. The Project involves the design, development, construction, operation and maintenance of Phase 1 of an up to 150 mega-watt (MW) greenfield geothermal power plant in the Oromia region of Ethiopia, located approximately 100 kilometers southeast of Addis Ababa. Environmental Categorization The Project is a Category A under MIGA's Policy in Environmental and Social Sustainability (2013) because it has potentially significant adverse environmental and social (E&S) risks and impacts. The most significant E&S risks include: land acquisition and involuntary resettlement; impact on water resources (water use and effluent discharge); waste generation (e.g. drill cuttings/fluids); impacts on biodiversity; air, noise and nuisance odor emissions; and occupational and community health and safety. Additional E&S impacts include the cumulative impacts associated with the potential development of future phases of the Project. Click here to view the Environmental and Social Review Summary.  Development Impact The key development impact of this project is a diversification of Ethiopia's energy supply away from hydroelectricity. Ethiopia has a strong reliance on its hydroelectricity with this resource accounting for nearly all of its generated power. This leaves the country vulnerable to exacerbated energy shortages during periods of drought. The success of the Project would provide an alternative energy source and result in baseload clean energy production.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data