logo

Tumen City Solid Waste Incineration Power Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

On September 8, 2017, construction of a solid waste incineration power plant commenced in Tumen City, Jilin Province. The sponsor of this Build Operate Transfer project was a local private company Anhui Shengyun Machinery Company Limited. The total investment was US$ 36.41 million (RMB 246 million). Geoenviron had a 100% stake in the project. The power plant had a power generation capacity of 9MW.

Status
Prospective
Sector
Water Supply and Storage, Warehouse, Biomass, Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tumen City Solid Waste Incineration Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tumen City Solid Waste Incineration Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

On September 8, 2017, construction of a solid waste incineration power plant commenced in Tumen City, Jilin Province. The sponsor of this Build Operate Transfer project was a local private company Anhui Shengyun Machinery Company Limited. The total investment was US$ 36.41 million (RMB 246 million). Geoenviron had a 100% stake in the project. The power plant had a power generation capacity of 9MW. It could process 900 tons of solid waste per day. Other particulars of the project were not reported.

Original sector

Municipal Solid Waste

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Warehouse, Biomass, Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project