Tung Chung Sewage Treatment Plant and supporting infrastructure upgrade
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The project entails the Tung Chung Sewage Treatment Plant extension and supporting infrastructure upgrade. Tung Chung Sewage Treatment Plant Expansion (and Tendering) Project Upgrade, Extension and Sludge Disposal Project. Among them, the expansion project is 40,000 m3 / d, the civil engineering of the upgrade project is 80,000 m3 / d, the treatment volume is 60,000 m3 / d in the short term, the s
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Commercial, Rail, Car parking, Power Transmission, Government, Manufacturing (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Automotive
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tung Chung Sewage Treatment Plant and supporting infrastructure upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project entails the Tung Chung Sewage Treatment Plant extension and supporting infrastructure upgrade. Tung Chung Sewage Treatment Plant Expansion (and Tendering) Project Upgrade, Extension and Sludge Disposal Project. Among them, the expansion project is 40,000 m3 / d, the civil engineering of the upgrade project is 80,000 m3 / d, the treatment volume is 60,000 m3 / d in the short term, the sludge drying is 80,000 m3 / d, and the treatment volume is 60,000 m3 / d m3 / d. (2) 4 river rectifications and restorations, totaling 4.60 km. Period of the concession is 25 years. SPV is Guangzhou Qingsheng Industrial Park Development Management Co., Ltd., a JV between the government company Guangzhou Nansha Industrial Investment Co., Ltd. (35%) and the private companies China Railway Construction Corporation (10%), China Railway Construction Nansha Investment Development Co., Ltd.(50%), China Railway Fourth Survey and Design Institute Group Co., Ltd.(1%), China Railway 12th Bureau Group Municipal Engineering Co., Ltd.(1%), China Railway 25th Bureau Group Co., Ltd.(1%), China Railway Construction Group Southern Engineering Co., Ltd.(1%) and China Railway Urban Construction Group Second Engineering Co., Ltd.(1%). Financial close took place on August 29, 2019. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=1d63ee96a2944fe3a5208d254ac61449 |
Original sector | Water and sewerage |
Procurement method | |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Commercial, Rail, Car parking, Power Transmission, Government, Manufacturing (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Automotive |
Article published date | 2024-09-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
