Tunisia - Natural Gas Transmission and Distribution Network Development Project
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Natural Gas Transmission and Distribution Network Development Project is in line with the 2009-2016 Natural Gas Transmission and Distribution Master Plan. This project is one of the responses to Tunisia’s current problems because concerns the inhabitants of the disadvantaged areas of the country’s west region. It aims to connect 19 municipalities of this region to the Tunisian Electricity and
- Sector
- Raw Materials, Power Transmission, Power Generation (CCGT), Natural Gas, Hotel, Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tunisia - Natural Gas Transmission and Distribution Network Development Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Natural Gas Transmission and Distribution Network Development Project is in line with the 2009-2016 Natural Gas Transmission and Distribution Master Plan. This project is one of the responses to Tunisia’s current problems because concerns the inhabitants of the disadvantaged areas of the country’s west region. It aims to connect 19 municipalities of this region to the Tunisian Electricity and Gas Corporation (STEG) natural gas supply system through the construction of 260 km of transmission network and 404 km of distribution network. Small and medium-sized industries, the tertiary sector and households in the project area will therefore have access to more affordable and less polluting fuel. The project will be implemented over a 5-year period, from 2015 to 2019. The project consists of four (04) components, namely: (1) gas transmission network comprising the construction of the transmission network; (2) gas distribution network comprising: i) construction of the main distribution network; and ii) installation of connections; (3) environmental and social mitigation measures relating to the acquisition of land, compensation and damages for agricultural losses and other ESMP costs as well as (4) PMU operating costs and works inspection and supervision. |
Original sector | Energy |
Budget |
Location
Country | Tunisia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Power Transmission, Power Generation (CCGT), Natural Gas, Hotel, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
