Tunisia - Project to develop and equip the Power Transmission Grid (PAERTE)

Sector: Manufacturing (Industrial) • Location: Tunisia

Source: African Development Bank (AfDB)

Project

The Project to Develop and Equip the Power Transmission Grid (PAERTE) is an investment project aimed at strengthening Tunisia's electricity transmission grid. It is part of the electricity transmission programme of the XIIIth Plan 2016-2020. The project is consistent with Tunisia's energy transition plans. Indeed, the envisage project infrastructure is aimed at integrating renewable energies into

Project Information FAQ

Project Information

4 Q
The project “Tunisia - Project to develop and equip the Power Transmission Grid (PAERTE)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tunisia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project to Develop and Equip the Power Transmission Grid (PAERTE) is an investment project aimed at strengthening Tunisia's electricity transmission grid. It is part of the electricity transmission programme of the XIIIth Plan 2016-2020. The project is consistent with Tunisia's energy transition plans. Indeed, the envisage project infrastructure is aimed at integrating renewable energies into the national electricity grid. The PAERTE project is therefore one of STEG's initiatives to strengthen and extend its electricity transmission network before this deadline, with a view to absorbing and transmitting countrywide the large volume of intermittent renewable energy expected from these planned solar and wind power plants. Its completion will make it possible to increase the transit capacity of transmission lines and distribute electricity, thus integrating locally produced renewable energy; reduce technical loss rates; and improve the overall quality of service. The duration of the project physical execution is 48 months from 2020 to 2023 with a total cost estimated at EUR 290 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data