Tunisia - Railway infrastructure modernization project
Sector: Rail • Location: Tunisia
Source: African Development Bank (AfDB)
The project for modernization of railway infrastructure is one component of Transport Sector Programme (TSP) for the period 1997-2001, and it aims to upgrade the transport sector by improving transport service efficiency and quality. The project as designed, is part of the efforts towards modernization of SNCFT production capacity, in line with the exigencies of transport market competitivity. It
- Sector
- Rail, Fertilizers, Mass Transit, Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tunisia - Railway infrastructure modernization project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project for modernization of railway infrastructure is one component of Transport Sector Programme (TSP) for the period 1997-2001, and it aims to upgrade the transport sector by improving transport service efficiency and quality. The project as designed, is part of the efforts towards modernization of SNCFT production capacity, in line with the exigencies of transport market competitivity. It aids the strengthening of the production facilities and thus i) improve the conditions for safe circulation of trains; ii) minimize degradation of equipment and installations as a result of the state of the track; iii) improve the quality of service through reduction of travel time on the Tunis-Ghardimaou, Tunis-Sousse and Tunis-Gabès lines and introduce a real- time passenger information system; iv) to save on operating costs; and improve passenger and employee safety on the lines concerned. By enabling SNCFT to be more competitive, the project will make it possible to decrease the State subsidy to USD 80 million yearly during the 9th plan, which is 20% less than would have been required in the absence of the railroad reforms. It will be implemented over a total period of 48 months. |
Original sector | Transport & Storage |
Budget |
Location
Country | Tunisia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Rail, Fertilizers, Mass Transit, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
