Tunisia - Railway infrastructure modernization project
Sector: Rail • Location: Tunisia
Source: African Development Bank (AfDB)
The project for modernization of railway infrastructure is one component of Transport Sector Programme (TSP) for the period 1997-2001, and it aims to upgrade the transport sector by improving transport service efficiency and quality. The project as designed, is part of the efforts towards modernization of SNCFT production capacity, in line with the exigencies of transport market competitivity. It
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project for modernization of railway infrastructure is one component of Transport Sector Programme (TSP) for the period 1997-2001, and it aims to upgrade the transport sector by improving transport service efficiency and quality. The project as designed, is part of the efforts towards modernization of SNCFT production capacity, in line with the exigencies of transport market competitivity. It aids the strengthening of the production facilities and thus i) improve the conditions for safe circulation of trains; ii) minimize degradation of equipment and installations as a result of the state of the track; iii) improve the quality of service through reduction of travel time on the Tunis-Ghardimaou, Tunis-Sousse and Tunis-Gabès lines and introduce a real- time passenger information system; iv) to save on operating costs; and improve passenger and employee safety on the lines concerned. By enabling SNCFT to be more competitive, the project will make it possible to decrease the State subsidy to USD 80 million yearly during the 9th plan, which is 20% less than would have been required in the absence of the railroad reforms. It will be implemented over a total period of 48 months. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
