Tunisia - Road Project VI
Sector: Manufacturing (Industrial) • Location: Tunisia
Source: African Development Bank (AfDB)
Road Project VI is part of the ongoing transport sector upgrading strategy initiated by the Tunisian Government under previous five-year development plans. This project is the second instalment of the Road Insfracture Investment Program financed by the Bank under the Eleventh Economic and Social Development Plan (2007-2011). This project was designed to address the capacity constraints (pavement w
- Sector
- Manufacturing (Industrial), Commercial, Hotel, Road, Raw Materials, Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tunisia - Road Project VI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Road Project VI is part of the ongoing transport sector upgrading strategy initiated by the Tunisian Government under previous five-year development plans. This project is the second instalment of the Road Insfracture Investment Program financed by the Bank under the Eleventh Economic and Social Development Plan (2007-2011). This project was designed to address the capacity constraints (pavement width and structural condition) of the classified road network which currently does not provide acceptable levels of service for traffic volumes nor respond to the rapid growth of heavy-vehicle traffic (responsible for the degradation of roadway structures and increased risks of accidents. The estimated cost is EUR 336.74 million, net of taxes, including a EUR 236 million AfDB loan. Planned for a nation-wide implementation, the project includes: (i) rehabilitating 862.8 km of classified roads; (ii) strengthening 691.3 km of classified roads; (iii) building 12 engineering structures; (iv) improving 759.4 km of feeder roads; and (v) upgrading/ dualising 52.6 km of the classified road network. These road rehabilitation works will help improve infrastructure and open up remote areas. It will also strengthen integrated rural development programs and improve livelihoods, with expected benefits respectively for agropastoral, industrial, tourism and craft activities. Project activities will start at the end of 2010, and will be completed by the end of 2015. |
Original sector | Transport & Storage |
Budget |
Location
Country | Tunisia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Commercial, Hotel, Road, Raw Materials, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
