logo

Tunisia - Road Project VI

Sector: Manufacturing (Industrial) • Location: Tunisia

Source: African Development Bank (AfDB)

Project

Road Project VI is part of the ongoing transport sector upgrading strategy initiated by the Tunisian Government under previous five-year development plans. This project is the second instalment of the Road Insfracture Investment Program financed by the Bank under the Eleventh Economic and Social Development Plan (2007-2011). This project was designed to address the capacity constraints (pavement w

Project Information FAQ

Project Information

4 Q
The project “Tunisia - Road Project VI” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tunisia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Road Project VI is part of the ongoing transport sector upgrading strategy initiated by the Tunisian Government under previous five-year development plans. This project is the second instalment of the Road Insfracture Investment Program financed by the Bank under the Eleventh Economic and Social Development Plan (2007-2011). This project was designed to address the capacity constraints (pavement width and structural condition) of the classified road network which currently does not provide acceptable levels of service for traffic volumes nor respond to the rapid growth of heavy-vehicle traffic (responsible for the degradation of roadway structures and increased risks of accidents. The estimated cost is EUR 336.74 million, net of taxes, including a EUR 236 million AfDB loan. Planned for a nation-wide implementation, the project includes: (i) rehabilitating 862.8 km of classified roads; (ii) strengthening 691.3 km of classified roads; (iii) building 12 engineering structures; (iv) improving 759.4 km of feeder roads; and (v) upgrading/ dualising 52.6 km of the classified road network. These road rehabilitation works will help improve infrastructure and open up remote areas. It will also strengthen integrated rural development programs and improve livelihoods, with expected benefits respectively for agropastoral, industrial, tourism and craft activities. Project activities will start at the end of 2010, and will be completed by the end of 2015.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data