Tunisia - Rural Drinking Water Supply (RDWS) Programme
Sector: Water Supply and Storage • Location: Tunisia
Source: African Development Bank (AfDB)
The Rural Drinking Water Supply (RDWS) Programme covers twenty (20) of the country’s twenty-four (24) Governorates, namely: Ariana, Béja, Ben Arous, Bizerte, Gabès, Gafsa, Jendouba, Kairouan, Kasserine, Kef, Mahdia, Manouba, Médinine, Nabeul, Sfax, Sidi Bouzid, Siliana, Sousse, Tataouine and Zaghouan. It targets the most disadvantaged rural communities on the national territory, whose isolation an
- Sector
- Water Supply and Storage, Automotive, Power Transmission, Government, Power Generation (CCGT)
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tunisia - Rural Drinking Water Supply (RDWS) Programme
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Rural Drinking Water Supply (RDWS) Programme covers twenty (20) of the country’s twenty-four (24) Governorates, namely: Ariana, Béja, Ben Arous, Bizerte, Gabès, Gafsa, Jendouba, Kairouan, Kasserine, Kef, Mahdia, Manouba, Médinine, Nabeul, Sfax, Sidi Bouzid, Siliana, Sousse, Tataouine and Zaghouan. It targets the most disadvantaged rural communities on the national territory, whose isolation and dispersal makes it difficult for them to have access to low-cost drinking water. In the remaining four (4) Governorates, (Tunis, Monastir, Tozeur and Kebili), the urban and rural areas are fully covered by SONEDE, the urban water utility company, with a drinking water access rate of 100%. The main expected outputs are: (i) the construction of 161 new DWS systems; (ii) the rehabilitation of 150 simple DWS systems; (iii) the rehabilitation of seven (7) complex DWS systems to be transferred to SONEDE; (iv) the improvement of drinking water supply conditions in the three transfer areas (Sud Kairouan, Bizerte and Jendouba); (v) the training of 100 DGGREE experts; (vi) the procurement of 20 vehicles; and (vi) the recruitment of 20 rural engineers/technicians. The estimated programme cost is UA 90.81 million and the duration of implementation is expected to be five years, from January 2012. |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Tunisia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Automotive, Power Transmission, Government, Power Generation (CCGT) |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
