logo
Project

Tunisia - Rural Electrification Project (Electricity VI)

Sector: Power Generation (CCGT) • Location: Tunisia

Source: African Development Bank (AfDB)

The rural electrification project (Electricity VI) is part of the priority measures undertaken by the Tunisian Government in the framework of the country’s 9th economic and social development Plan (1997-2001). The project was initiated by Tunisian Electricity and Gas Company (STEG) and is fully in keeping with previous rural electrification projects. It aims to : (i) install 2 800 km of 30 kV thre

Sector
Power Generation (CCGT), Government
Location
Tunisia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Tunisia - Rural Electrification Project (Electricity VI)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tunisia - Rural Electrification Project (Electricity VI)” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tunisia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The rural electrification project (Electricity VI) is part of the priority measures undertaken by the Tunisian Government in the framework of the country’s 9th economic and social development Plan (1997-2001). The project was initiated by Tunisian Electricity and Gas Company (STEG) and is fully in keeping with previous rural electrification projects. It aims to : (i) install 2 800 km of 30 kV three-phase overhead and 17.5 kV single phase lines; (ii) construct 2,820 MV/LV distribution substations; (iii) install 4,800 km of LV lines; (iv) connect 45 000 domestic subscribers and 320 LV motor pumps; and (v) improve the operation of MV and LV networks as well as increase the consumption of LV subscribers in the rural areas. The project will be implemented over a period of six (6) years from June 1999 to end of June 2005.

Original sector

Energy

Budget

Location

Country

Tunisia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project