Tunisia - Rural Electrification Project (Electricity VI)
Sector: Power Generation (CCGT) • Location: Tunisia
Source: African Development Bank (AfDB)
The rural electrification project (Electricity VI) is part of the priority measures undertaken by the Tunisian Government in the framework of the country’s 9th economic and social development Plan (1997-2001). The project was initiated by Tunisian Electricity and Gas Company (STEG) and is fully in keeping with previous rural electrification projects. It aims to : (i) install 2 800 km of 30 kV thre
- Sector
- Power Generation (CCGT), Government
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tunisia - Rural Electrification Project (Electricity VI)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The rural electrification project (Electricity VI) is part of the priority measures undertaken by the Tunisian Government in the framework of the country’s 9th economic and social development Plan (1997-2001). The project was initiated by Tunisian Electricity and Gas Company (STEG) and is fully in keeping with previous rural electrification projects. It aims to : (i) install 2 800 km of 30 kV three-phase overhead and 17.5 kV single phase lines; (ii) construct 2,820 MV/LV distribution substations; (iii) install 4,800 km of LV lines; (iv) connect 45 000 domestic subscribers and 320 LV motor pumps; and (v) improve the operation of MV and LV networks as well as increase the consumption of LV subscribers in the rural areas. The project will be implemented over a period of six (6) years from June 1999 to end of June 2005. |
Original sector | Energy |
Budget |
Location
Country | Tunisia |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in Tunisia
- Scatec Tozeur solar PV plant
- Sidi Mansour Wind Farm
- Tataouine Solar Power Plant
- Tunisia - Road Project VI
- Tunisia - Rural Drinking Water Supply (RDWS) Programme
- Tunisia - Natural Gas Transmission and Distribution Network Development Project
- Scatec Sidi Bouzid Mezzouna solar PV plant
- Hasdrubal Gas Processing Plant
