logo

Tunisia - Sidi El Barrak Dam Construction Project

Sector: Manufacturing (Industrial) • Location: Tunisia

Source: African Development Bank (AfDB)

Project

The Sidi El barrak Development Project meets a pressing need and falls within broad objectives of the Tunisian Government’s Economic and Social Programme aimed at developing agriculture, tourism and industries which are the bases of the countries economy. It is in keeping with the North Master Plan. The Sidi El Barrak dam project will make it possible to supply 188 million m3/year, 35 million m3/y

Project Information FAQ

Project Information

4 Q
The project “Tunisia - Sidi El Barrak Dam Construction Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tunisia. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sidi El barrak Development Project meets a pressing need and falls within broad objectives of the Tunisian Government’s Economic and Social Programme aimed at developing agriculture, tourism and industries which are the bases of the countries economy. It is in keeping with the North Master Plan. The Sidi El Barrak dam project will make it possible to supply 188 million m3/year, 35 million m3/year of which will be used locally for irrigation purposes and recharging Lake Ichkeul and the remainder will be conveyed to the regions of Tunis, Cap Bon and the Sahel. The water made available as a result of the project will enable the irrigation of an additional 4,085 hectares in the project area, contribute to the intensification and extension of agricultural production over 9,500 existing irrigated hectares in the Cap Bon region and make it possible to meet the rising demand for drinking water of an estimated population of 3.48 million inhabitants of the regions of Tunis, Cap Bon, Sousse and Sfax. The project comprises the construction of a reservoir dam with a capacity of 264 million m3 at the mouth of the Zouara Wadi, a pumping station and a discharge outlet followed by a channel to transfer the water from the reservoir to the sedjenane dam. Implementation of this work also requires the rebuilding of existing sections of roads and access roads included in the area to be flooded by the reservoir and the protection of agricultural and settlement areas by building dikes as well as the implementation of a resettlement programme for displaced persons.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data