Tunisia Northern Tunis Wastewater Project
Sector: Water Supply and Storage • Location: Tunisia
Source: World Bank
The objectives of the Northern Tunis Wastewater Project for Tunisia are to: (a) provide an environmentally safe disposal system for the treated wastewater which will not be reused in agriculture in the North of Tunis; and (b) increase the quantity and quality of treated wastewater made available to farmers to encourage its reuse in agriculture in the Borj Touil area. There are three components to
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Forest Products and Packaging, Residential, Power Generation (CCGT), Raw Materials, Government, Commercial
- Location
- Tunisia
- Updated
- 22 Jul 2026
- Source
- World Bank
ConstructChat
Ask ConstructChat about Tunisia Northern Tunis Wastewater Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Northern Tunis Wastewater Project for Tunisia are to: (a) provide an environmentally safe disposal system for the treated wastewater which will not be reused in agriculture in the North of Tunis; and (b) increase the quantity and quality of treated wastewater made available to farmers to encourage its reuse in agriculture in the Borj Touil area. There are three components to the project, the first component being transfer of Treated Wastewater (TWW) to increase its reuse in agriculture. This component will focus on the investments necessary to transfer the TWW from its existing discharge point close to the El Kehlij agriculture drainage canal up to a storage basin, from which it will be made available for reuse in agriculture. The Global Environmental Facility (GEF) grant will finance a portion of the investments under this component. The second component is the improvement of the discharge of the remaining TWW in the Mediterranean Sea. This component aims at developing the infrastructure necessary to improve the discharge of the remaining TWW in the Mediterranean Sea. Activities under this component include: TWW transfer; submarine outfall; and studies. Finally, the third component is the monitoring and capacity strengthening. This component will fund important accompanying measures for the implementation of the project, including consulting services to strengthen: (i) water quality monitoring systems in the project area; and (ii) coordination mechanisms among agencies involved in wastewater reuse, in particular Tunisian National Sanitation Utility (ONAS) and Ministry of Agriculture, Hydraulic Resources and Fisheries (MARHP). |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tunisia |
Source
Source | World Bank |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Forest Products and Packaging, Residential, Power Generation (CCGT), Raw Materials, Government, Commercial |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
