Tunnel Condensate Line Replacement
Sector: Commercial • Location: Winnipeg, Manitoba, Canada
Source: Dodge USA
This project is in two phases: the first phase consists of removal of existing abandoned-in-place piping in the tunnel and installation of two 38mm diameter condensate lines (schedule 80). These lines are not connected in the first phase. The second phase, which will occur once heating season is ended, will connect the Phase 1 piping with removal of the existing condensate lines. The tunnel contai
- Status
- Closed
- Sector
- Commercial, Tunnel, Road
- Location
- Winnipeg, Manitoba, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tunnel Condensate Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is in two phases: the first phase consists of removal of existing abandoned-in-place piping in the tunnel and installation of two 38mm diameter condensate lines (schedule 80). These lines are not connected in the first phase. The second phase, which will occur once heating season is ended, will connect the Phase 1 piping with removal of the existing condensate lines. The tunnel containing the piping is approximately 265m long and runs from the Legislative Building to the powerhou... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Manitoba |
City | Winnipeg |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Tunnel, Road |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
