Tunnel Creek Alternative Trail REBID
Closed · Nevada · Last reported Jun 2024
Source: Dodge USA
The project includes the construction of approximately 2.5 miles of natural surface, sustainable singletrack, non-motorized multi use trail, approximately 18-36 inches wide within park boundaries. The trail construction may also warrant construction of retaining walls or sutter walls along switchbacks and trail improvements to protect sensitive areas. The project will include the engineering and i
- Status
- Closed
- Sector
- Commercial, Bridge, Car parking, Tunnel, Mass Transit, Automotive, Rail
- Location
- Incline Village, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tunnel Creek Alternative Trail REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the construction of approximately 2.5 miles of natural surface, sustainable singletrack, non-motorized multi use trail, approximately 18-36 inches wide within park boundaries. The trail construction may also warrant construction of retaining walls or sutter walls along switchbacks and trail improvements to protect sensitive areas. The project will include the engineering and installation of two bridges across Tunnel Creek; bridge locations to be determined based on field ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Incline Village |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Car parking, Tunnel, Mass Transit, Automotive, Rail |
Article published date | 2024-06-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
