logo

Tunnel Creek Alternative Trail REBID

Closed · Nevada · Last reported Jun 2024

Source: Dodge USA

Project
Closed

The project includes the construction of approximately 2.5 miles of natural surface, sustainable singletrack, non-motorized multi use trail, approximately 18-36 inches wide within park boundaries. The trail construction may also warrant construction of retaining walls or sutter walls along switchbacks and trail improvements to protect sensitive areas. The project will include the engineering and i

Status
Closed
Sector
Commercial, Bridge, Car parking, Tunnel, Mass Transit, Automotive, Rail
Location
Incline Village, Nevada, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Tunnel Creek Alternative Trail REBID

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tunnel Creek Alternative Trail REBID” is an infrastructure initiative in the Commercial sector, located in Incline Village, Nevada, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project includes the construction of approximately 2.5 miles of natural surface, sustainable singletrack, non-motorized multi use trail, approximately 18-36 inches wide within park boundaries. The trail construction may also warrant construction of retaining walls or sutter walls along switchbacks and trail improvements to protect sensitive areas. The project will include the engineering and installation of two bridges across Tunnel Creek; bridge locations to be determined based on field ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Nevada

City

Incline Village

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Car parking, Tunnel, Mass Transit, Automotive, Rail

Article published date

2024-06-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project