Tunnel Rehabilitation Phase 1 - BP2 McCracken Tunnel
Closed · Ohio · Last reported Jan 2025
Source: Dodge
The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the eas
- Status
- Closed
- Sector
- Water Supply and Storage, Tunnel, Road, Commercial, Power Transmission, Power Generation (CCGT)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tunnel Rehabilitation Phase 1 - BP2 McCracken Tunnel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the removal and replacement of the North McCracken tunnel roof, the complete removal of the North McCracken tunnel bypass, and the inspection and patching of tunnels located underneath building footprints. The Project will also construct a new steam line within the North McCracken Tunnel. Under the Alternate 1 scope of work, a new water main will be constructed from the east end of the Oval to the west end and then up to the Cockins/Dulles loading dock area. The Altern... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Tunnel, Road, Commercial, Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
