Tuolumne River Trash Control Project
Sector: Water Supply and Storage • Location: Modesto, California, United States of America (USA)
Source: California Department of Transportation (Caltrans)
Install Gross Solid Removal Device (GSRD). The purpose of this project is to install a full trash capture device at the inlet end of existing culverts. The twin 60-inch diameter culverts are located on the southeast quadrant of State Route 99 (PM 14.9) and Tuolumne River, in the City of Modesto. The implementation of a Trash TMDL will help Department in achieving its goal of 100 percent compliance
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction phase |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Install Gross Solid Removal Device (GSRD). The purpose of this project is to install a full trash capture device at the inlet end of existing culverts. The twin 60-inch diameter culverts are located on the southeast quadrant of State Route 99 (PM 14.9) and Tuolumne River, in the City of Modesto. The implementation of a Trash TMDL will help Department in achieving its goal of 100 percent compliance pertaining to the Trash Amendments. It is further assumed that the project footprint will extend 100 feet south of the culvert inlets, this will include any ground disturbance due to Construction Staging and other pertinent work. At the project location, which is identified as a Significant Trash Generating Area, the stormwater, along with any trash, flows via a lined channel into existing twin culverts, which then discharge the water into the Tuolumne River. Constructing a Trash TMDL device is necessary for capturing trash, generating Compliance Units (CUs) and helping Department achieve its overall numeric goal of zero trash discharge to the Tuolumne River. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America (USA)
- CNG Fueling at Hamilton Bus Facility
- Industrial wastewater treatment plant
- US 271 from FM 16 North to the Upshur County Line
- Memorial Drive from BW 8 to Tallowood Road
- SH 105 - I-45 to North Frazier Street -SH 75
- Water Treatment Plants Marana Water Treatment Campuses
- Chicago Riverwalk
- Pierce County Sewer and Traffic Operations Facility
