Turbine Replacement for Propane Dehydrogenation Plant in Spain
The owner, status and timeline of this project. A free account opens every field.
Source: Via TT
A German chemicals and plastics company started a turbine replacement project at its Spanish propane dehydrogenation (PDH) plant to support its net zero emissions by 2050 goal. The order includes a 23.3MW High-speed High Voltage induction motor, Medium Voltage Drives, and a converter transformer.
- Status
- Closed
- Sector
- Wind, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Spain
- Updated
- 22 Jul 2026
- Source
- Via TT
ConstructChat
Ask ConstructChat about Turbine Replacement for Propane Dehydrogenation Plant in Spain
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A German chemicals and plastics company started a turbine replacement project at its Spanish propane dehydrogenation (PDH) plant to support its net zero emissions by 2050 goal. The order includes a 23.3MW High-speed High Voltage induction motor, Medium Voltage Drives, and a converter transformer. |
Original sector | Energy |
Location
Country | Spain |
Source
Source | Via TT |
URL |
More Details
Record type | Project |
Sector | Wind, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2026-03-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
