Turf Replacement & Accessibility Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Replace outdated Synthetic Turf including remove all infilled turf field carpet and infill materials, install new pad system across the playing field surface, replace collector line along the West side with solid collector line and root, replace non-compliant concrete pathways with accessible concrete pathways, replace all dugout gates with accessible gates, replace access staircase with concrete
- Status
- Closed
- Sector
- Cement, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Turf Replacement & Accessibility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace outdated Synthetic Turf including remove all infilled turf field carpet and infill materials, install new pad system across the playing field surface, replace collector line along the West side with solid collector line and root, replace non-compliant concrete pathways with accessible concrete pathways, replace all dugout gates with accessible gates, replace access staircase with concrete staircase, replace existing drinking fountain with accessible drinking fountain, install new chai... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
