Turk Street Safety Project
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Turk Street Safety Project Share this: Facebook Twitter LinkedIn Project Introduction The Turk Street Safety Project began in Spring 2016. SFMTA identified Turk Street for improvement, between Market Street and Gough Street, based on its inclusion on the Vision Zero High Injury Network. The city's High-Injury Network consists of the 13 percent of San Francisco streets that account for 75 percent o
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Turk Street Safety Project Share this: Facebook Twitter LinkedIn Project Introduction The Turk Street Safety Project began in Spring 2016. SFMTA identified Turk Street for improvement, between Market Street and Gough Street, based on its inclusion on the Vision Zero High Injury Network. The city's High-Injury Network consists of the 13 percent of San Francisco streets that account for 75 percent of traffic related injuries and fatalities. Turk Street is a vibrant corridor with a diverse range of people: families, seniors, children, students, workers, shoppers, and tourists. For surrounding land use, the street supports extremely high density of both historic buildings and newer developments. It's home to playgrounds schools, light industry, retail, entertainment, and a number of service providers and care facilities. Turk is a street teeming with San Francisco life and energy. The wide variety of people on Turk is reflected in the wide variety of transportation use, including private automobiles, transit, paratransit, pedestrians, bicyclist, and both passenger and commercial loading. As a high-injury corridor, this project seeks to design a safer, more predictable, and more comfortable for all users. Project Timeline Planning Phase - Spring 2016 to Winter 2017 Planning and Design Pending Implementation - Spring 2018 Construction Pending Project Status Completed Neighborhoods South of Market (SoMa) Downtown / Civic Center PROJECT GOALS Design a safer and more comfortable walking and biking environment on Turk Street Create a more predictable and safer driving environment Fill a gap in the existing bicycle network on Turk Street Incorporate community needs and desires into planning process and final design Address emergency access needs Provide space for normal everyday operation on the street related to passenger and commercial loading COLLISION ANALYSIS - VISION ZERO - SAFETY IN ACTION Over a five-year period, there were a total of 174 traffic collisions along Turk Street between Mason and Polk. 92 of these involved pedestrians and bicyclists, which were often related to midblock crossings and vehicle turning movements. Further field observation and feedback from stakeholders, including a walkthrough exercise led by WalkSF, revealed high traffic speeds and frequent unpredictable behavior, like vehicle double parking in travel lanes and bicyclists riding on the sidewalk. PROPOSED DESIGN In keeping with the diverse needs on Turk Street, the project team proposes a design with the following characteristics to address observed issues. Standard pedestrian safety improvements like high visibility crosswalks, painted safety zones, and signal improvements, A lane reduction to reduce vehicle speeding, make drivers more predictable, create more visibility, and allow for separation between travel modes, A protected bicycle lane to reduce bicycle-vehicle conflicts, provide a dedicated space for bicycles thereby reducing sidewalk-riding A No Parking Any Time buffer that meets the passenger and commercial vehicle active loading needs for normal everyday operation, and to accommodate emergency vehicle access needs. TIMELINE Community Outreach: May 2016 - October 2017 Public Hearing: November 2017 Environmental Review: November 2017 - December 2017 SFMTA Board of Directors Meeting: January 2018 Implementation: February - March 2018 Contact Information Adrian Leung Adrian.Leung@sfmta.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
