Turkey: Antalya Airport Expansion Project (Long Term Facility)

Approved · Turkey

Source: Asian Infrastructure Investment Bank (AIIB)

The Project is a follow-on transaction to earlier approved two projects: Antalya Airport Expansion Project (P000639) and Antalya Airport Expansion Project (Upsize Facility) (P000847), which were part of two bridge facilities with the total signed amount of EUR2.3 billion and maturity of September 2025. AIIB's commitment amounted to EUR202.5 million, and the Project was jointly co-financed along wi

Status
Prospective
Sector
Water Supply and Storage, Bridge, Biomass, Airport, Solar, Raw Materials, Waste Processing and Treatment, Residential, Manufacturing (Industrial), Commercial, Government
Location
Turkey
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Turkey: Antalya Airport Expansion Project (Long Term Facility)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Turkey: Antalya Airport Expansion Project (Long Term Facility)” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project is a follow-on transaction to earlier approved two projects: Antalya Airport Expansion Project (P000639) and Antalya Airport Expansion Project (Upsize Facility) (P000847), which were part of two bridge facilities with the total signed amount of EUR2.3 billion and maturity of September 2025. AIIB's commitment amounted to EUR202.5 million, and the Project was jointly co-financed along with IFC (EUR212.5 million), European Bank for Reconstruction and Development (EBRD, EUR190 million), DEG (EUR50 million) and Turkish and international commercial banks. In previous approved projects, AIIB financed capital expenditures and financing costs incurred during the construction period with full recourse to Sponsors (TAV and Fraport). In the Project, AIIB will refinance previously provided bridge facilities by providing a non-recourse long-term project finance loan after completion of the construction Phase I, i.e., Q1 2025. The previous bridge facility loan which is to be refinanced through the long-term loan, financed three components of the Phase 1 expansion: Terminal Works: expansion of International Terminal 2, Domestic Terminal and associated carparks; Airside Works: additional apron space and taxiways, infrastructure works for new maintenance hangar area, fuel farm, cargo terminal; and Other Works: gates, landscaping, on-site solar farm and others.

Original sector

Transport

Budget

Location

Country

Turkey

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Biomass, Airport, Solar, Raw Materials, Waste Processing and Treatment, Residential, Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project