Turkey: Efeler 97.6MWE Geothermal Power Plant Expansion Project
Approved · Turkey
Source: Asian Infrastructure Investment Bank (AIIB)
The Project consists of the construction of three additional geothermal power plant (GPP) units, including their associated production and reinjection wells, pipelines, electricity switchyards and transmission lines.
- Status
- Prospective
- Sector
- Geothermal, Residential, Hydrogen, Raw Materials, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Turkey
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Turkey: Efeler 97.6MWE Geothermal Power Plant Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of the construction of three additional geothermal power plant (GPP) units, including their associated production and reinjection wells, pipelines, electricity switchyards and transmission lines. |
Original sector | Energy |
Budget |
Location
Country | Turkey |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Residential, Hydrogen, Raw Materials, Commercial, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2025-09-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
