logo

Turkey: Istanbul Waste to Energy Generation Project (Previously: Construction and Operation of a Waste Incineration and Energy Generation Plant)

Sector: Water Supply and Storage • Location: Turkey

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The Project involves financing the construction of a Waste to Energy Generation (WtE) facility, developed by Istanbul Metropolitan Municipality (IMM). The WtE facility is located about 20 km north of Istanbul in the Eyüp district. It would be the largest facility in Europe with an annual capacity of 1 million tons (about 15% of Istanbul's waste), generating 630 GWh of net electricity sufficient fo

Project Information FAQ

Project Information

5 Q
The project “Turkey: Istanbul Waste to Energy Generation Project (Previously: Construction and Operation of a Waste Incineration and Energy Generation Plant)” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves financing the construction of a Waste to Energy Generation (WtE) facility, developed by Istanbul Metropolitan Municipality (IMM). The WtE facility is located about 20 km north of Istanbul in the Eyüp district. It would be the largest facility in Europe with an annual capacity of 1 million tons (about 15% of Istanbul's waste), generating 630 GWh of net electricity sufficient for 400,000 households. The Engineering, Procurement and Construction (EPC) contract was awarded to Hitachi Zosen Inova - Makyol İnşaat Sanayi Turizm ve Ticaret A.Ş. Joint Venture (HZI-Makyol). The EPC contractor will also operate the WtE for one year before transferring to ISTAC. As of July 2021, 98% of construction works have been completed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data