logo

Turkey: North Marmara Highway - Nakkaş-Başakşehir BOT Project

Sector: Water Supply and Storage • Location: Turkey

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The Project involves the development, construction, and operation of the Nakkaş-Başakşehir section of the Northern Marmara Highway (NMH). The 438-kilometer (KM) NMH is one of Turkey's highest-value investments in the road sector. NMH bypasses Istanbul's congested road network to the north and provides additional dual carriageway connectivity between Asia and Europe, through the Third Bosporus Brid

Project Information FAQ

Project Information

5 Q
The project “Turkey: North Marmara Highway - Nakkaş-Başakşehir BOT Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the development, construction, and operation of the Nakkaş-Başakşehir section of the Northern Marmara Highway (NMH). The 438-kilometer (KM) NMH is one of Turkey's highest-value investments in the road sector. NMH bypasses Istanbul's congested road network to the north and provides additional dual carriageway connectivity between Asia and Europe, through the Third Bosporus Bridge or Yavuz Sultan Selim Bridge (YSS Bridge). The Project is the NMH's eighth section and comprises a toll road linking the western and northern districts of Başakşehir, Arnavutköy, Avcılar, and Çatalca, an area located on the European side of Istanbul, between the city center and the New Istanbul Airport. The Project's contractual length is 45 km and comprises 31.31 km of main and connection roads, a 1.6 km cable-stayed bridge crossing the Sazlıdere valley, 17 overpasses, 19 underpasses, 56 culverts, 11 junctions, and 7 viaducts. The Project's total cost is approximately EUR1.45 billion and benefits from a concession term of approximately 18 years.  The Project is regulated by the Implementation Contract (IC), a Build-Operate-Transfer (BOT) agreement signed between the Borrower as the Appointed Company (AC) and the General Directorate of Highways (KGM or the Authority). It contemplates a minimum revenue guarantee (MRG), paid semi-annually. Both MRG and toll are paid in TRY and indexed for EUR inflation.  The Project is owned by Rönesans Holding A.Ş. (Rönesans), through NAK Infrastructure Investments B.V., a wholly owned subsidiary incorporated in the Netherlands and by a consortium of Korean investors formed by Samsung C&T Corporation (Samsung), Korea Overseas Infrastructure & Urban Development Corporation (KIND), and KIAMCO PIS Infra Special Asset Investment Trust No.1 (PIS Fund), an investment trust established by the Government of Korea, managed by KDB Infrastructure Investments Asset Management Co. Ltd. (KIAMCO) and represented by KEB Hana Bank as trustee. The Project is built by REC Uluslararası İnşaat Yatırım Sanayi ve Ticaret A.Ş., a wholly owned subsidiary of Rönesans (the EPC Contractor or REC), under a lump-sum turn-key (LSTK), fixed-price and date-certain agreement with the AC that covers the design, engineering, procurement, construction, testing, and commissioning works of the Project (the EPC Contract). The Project will be operated under an Operations and Maintenance agreement (the O&M Contract) by an entity to be owned by Rönesans through RNS PPP Altyapı Ticaret A.Ş., Samsung C&T and Korea Expressway Corporation (KEC) (the Operator).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data