Turkey Peak Dam and Reservoir REBID
Sector: Water Supply and Storage • Location: Mineral Wells, Texas, United States of America
Source: Dodge
Furnishing and installing materials, equipment, services, and incidentals for constructing a new 100-foot high, 3,700-foot long dam including concrete, steel pipe outlet and control valves, foundation grout curtain and abutment cutoff walls, spillway, earthen saddle dam, earth work, constructing approximately 2.5 miles of county roadway including six-span bridge, boat ramp, site work, highperforma
- Status
- Closed
- Sector
- Water Supply and Storage, Hydro, Cement, Steel, Government, Bridge, Road, Manufacturing (Industrial), Metal, Commercial
- Location
- Mineral Wells, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Turkey Peak Dam and Reservoir REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Furnishing and installing materials, equipment, services, and incidentals for constructing a new 100-foot high, 3,700-foot long dam including concrete, steel pipe outlet and control valves, foundation grout curtain and abutment cutoff walls, spillway, earthen saddle dam, earth work, constructing approximately 2.5 miles of county roadway including six-span bridge, boat ramp, site work, highperformance industrial coatings, and other Work shown and indicated in the Bidding Documents. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Mineral Wells |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Hydro, Cement, Steel, Government, Bridge, Road, Manufacturing (Industrial), Metal, Commercial |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
