logo

Turner River Solar Farm and Cloudbreak Battery Energy Storage System

Sector: Metal • Location: Pilbara, Western Australia, Australia

Source: TaiyangNews

Project
Under Construction

Fortescue has started construction on the 690 MW Turner River Solar Farm and a 650 MWh battery energy storage system (BESS) at Cloudbreak as part of its Real Zero decarbonization plan across its iron ore operations in the Pilbara region of Western Australia. The Cloudbreak BESS will comprise 125 battery units supplied by BYD and connected to the Cloudbreak Solar Farm. The Turner River Solar Farm i

Status
Under Construction
Sector
Metal, Energy Storage, Power Generation (CCGT), Solar, Raw Materials
Location
Pilbara, Western Australia, Australia
Updated
22 Jul 2026
Source
TaiyangNews

ConstructChat

Ask ConstructChat about Turner River Solar Farm and Cloudbreak Battery Energy Storage System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Turner River Solar Farm and Cloudbreak Battery Energy Storage System” is an infrastructure initiative in the Metal sector, located in Pilbara, Western Australia, Australia. Taiyo aggregates data on it from TaiyangNews.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Fortescue has started construction on the 690 MW Turner River Solar Farm and a 650 MWh battery energy storage system (BESS) at Cloudbreak as part of its Real Zero decarbonization plan across its iron ore operations in the Pilbara region of Western Australia. The Cloudbreak BESS will comprise 125 battery units supplied by BYD and connected to the Cloudbreak Solar Farm. The Turner River Solar Farm is scheduled for completion in 2028 and will include more than a million solar panels. The Cloudbreak BESS is expected to be completed in fiscal year 2027 and will provide 74 MW of power for around 8 hours. These projects are part of Fortescue's broader Pilbara Green Grid integrated renewable energy network designed to power mining operations with renewable electricity.

Original sector

Energy

Budget

Location

Country

Australia

State

Western Australia

City

Pilbara

Source

Source

TaiyangNews

URL

More Details

Record type

Project

Sector

Metal, Energy Storage, Power Generation (CCGT), Solar, Raw Materials

Article published date

2026-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project