Turney Creek Culvert Replacement
Bid results · Connecticut · Last reported Jan 2024
Source: Dodge USA
The work consists of the replacement of the entire Riverside Drive Bridge in conjunction with the Turney Creek outfall. This will also include the replacement of deteriorating timber bulkhead, replacement of twin sanitary sewer siphons with three sanitary sewer siphons below the bridge, and the deteriorating concrete bridge itself
- Status
- Closed
- Sector
- Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Fairfield, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Turney Creek Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of the replacement of the entire Riverside Drive Bridge in conjunction with the Turney Creek outfall. This will also include the replacement of deteriorating timber bulkhead, replacement of twin sanitary sewer siphons with three sanitary sewer siphons below the bridge, and the deteriorating concrete bridge itself |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Fairfield |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Water Supply and Storage, Bridge, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
