logo

Tursun-Zade Solid Waste

Sector: Water Supply and Storage • Location: Tajikistan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

Translated version of this PSD: Russian The EBRD is considering financing a programme of priority capital investments to improve the solid waste management services in Tursun-Zade city, Tajikistan. Proceeds from this transaction will (i) improve landfill sanitary and operating standards and (ii) increase efficiency/coverage of solid waste collection and transportation in Tursun-Zade. The Bank will

Project Information FAQ

Project Information

4 Q
The project “Tursun-Zade Solid Waste” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Translated version of this PSD: Russian The EBRD is considering financing a programme of priority capital investments to improve the solid waste management services in Tursun-Zade city, Tajikistan. Proceeds from this transaction will (i) improve landfill sanitary and operating standards and (ii) increase efficiency/coverage of solid waste collection and transportation in Tursun-Zade. The Bank will closely monitor the success of the project. It is proposed that the following indicators will be monitored before and after the project implementation: The transition impact potential of the proposed sovereign guaranteed loan to a solid waste company of Tursun-Zade arises from: Municipality-owned enterprise “Muassisai Manziliyu Kommunali va Khojagidori” (MMKK) of Tursun-Zade city. The EBRD will provide a sovereign guaranteed loan of up to US$ 2 million to MMKK. Up to US$ 5.4 million including investment and technical cooperation grants. The project will be co-financed by an investment grant from an international donor. Categorised B. The Project involves the rehabilitation and upgrade of the existing dumpsite of the City of Tursun-Zade into a controlled landfill as well as the improvement in waste collection services and transport to the landfill. Municipal waste is currently disposed of at an existing dumpsite located 7.6 km from the City. The dumpsite has been in operation since 1968. A feasibility study conducted for the Project considered the option of developing a new landfill on a new site or upgrading the existing dumpsite. The study determined that the existing site was suitable for upgrade to an engineered landfill and this is regarded as the preferred option. The engineered landfill will be constructed in an unused area of the dumpsite but on land approved by the Land Commission within the existing dumpsite boundaries. The existing dumping areas will be re-cultivated and closed. Although municipal solid waste processing and disposal facilities are included in the EBRD’s Environmental and Social Policy’s indicative Appendix 1 list of Category A projects, it was concluded through a review of the feasibility study and supporting environmental and social baseline information that the Project will substantially improve the existing dumpsite conditions and result in some environmental and social benefits including improved waste disposal and reducing impacts on ground and surface water. As such the Project has been categorised as B. Environmental and Social Due Diligence (ESDD) is currently being undertaken by an independent consultant as part of an Environmental Impact Assessment (EIA) process for the Project. As part of the ESDD, the consultant is analysing the impacts associated with the new landfill and the improvements to solid waste collection and transport methods, including gender and livelihood impacts and potential opportunities. The nearest village is 500 m from the dumpsite boundaries (and the proposed landfill site). Some households were located on the dumpsite boundary and following financial support from the municipality in 2012 have moved into new houses. Informal waste picking is practised at the dumpsite and with dump area closure and formalised solid waste disposal some livelihood issues may arise. These issues are being considered as part of the ESDD. An Environmental and Social Action Plan will be developed for the Project to mitigate potential impacts and risks and to ensure that the Project meets the EBRD Performance Requirements within an agreed timeframe as well as to promote benefits sharing and equal opportunities. If required, a livelihood restoration framework or plan will be developed in order to address potential livelihood issues. Furthermore, the consultant will develop a Stakeholder Engagement Plan and Non Technical Summary of the EIA to ensure the appropriate level of engagement with local communities and other stakeholders. The following technical co-operation (“TC”) assignments are a part of this project: Feasibility Study US$ 488,000 (€ 370,000) feasibility study financed by the Early Transition Countries Fund will, inter alia: (a) prepare a plan and cost estimates for improving waste collection and the disposal capacity of the landfill, (b) assess the options for landfill facility upgrade, (c) review operations and recommend improvements, and (d) prepare a strategic and operational business plan for the Company. Project Implementation Support International consultants will assist the project implementation group with engineering design, procurement, contract administration, engineer’s supervision, financial control, project management and reporting. US$ 500,000 (€ 380,000) is proposed to be financed by an international donor. Corporate Development, Stakeholder Participation and City Support Programme International consultants will support operational and financial improvements to secure the sustainability of the Company operations, implement a Stakeholder Participation Programme, and introduce a Public Service Contract between the Company and the City. US$ 440,000 (€ 335,000)is proposed to be financed by an international donor. For consultant opportunities for projects financed by technical cooperation funds, visit Consultancy Services.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data