logo
ProjectPre-Design

Turtle Connection & Cross Lakes FDR Development

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project would consist of a rock arch rapids and removal of the existing dam at Cross Lake, abandonment and removal of the Turtle Lake dam, and a rock arch rapids and water control structure at South Connection Lake, which will establish preferred long-term lake levels and provide fish passage. The proposal provides a gated/stop log outlet structure at South Connection Lake to provide the abili

Status
Prospective
Sector
Water Supply and Storage, Government, Hydro, Commercial, Waste Processing and Treatment
Location
Shoreview, Minnesota, United States of America
Updated
19 Nov 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Turtle Connection & Cross Lakes FDR Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Turtle Connection & Cross Lakes FDR Development” is an infrastructure initiative in the Water Supply and Storage sector, located in Shoreview, Minnesota, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The project would consist of a rock arch rapids and removal of the existing dam at Cross Lake, abandonment and removal of the Turtle Lake dam, and a rock arch rapids and water control structure at South Connection Lake, which will establish preferred long-term lake levels and provide fish passage. The proposal provides a gated/stop log outlet structure at South Connection Lake to provide the ability to manage water levels in Turtle and Connection lakes for FDR.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Minnesota

City

Shoreview

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Hydro, Commercial, Waste Processing and Treatment

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project