Tuttle Pool Design
One of 10,000+ projects Taiyo tracks in Ohio.
Source: Dodge USA
The Columbus Recreation and Parks Department (CRPD) is requesting proposals from qualified Consulting Firms for professional design services associated with the Marion Franklin and Tuttle Pool Replacement Project (Project), to prepare construction documents that will replace the existing Marion Franklin and Tuttle swimming pools
- Status
- Prospective
- Sector
- Car parking, Government, Automotive, Commercial, Manufacturing (Industrial)
- Location
- Columbus, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tuttle Pool Design
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Columbus Recreation and Parks Department (CRPD) is requesting proposals from qualified Consulting Firms for professional design services associated with the Marion Franklin and Tuttle Pool Replacement Project (Project), to prepare construction documents that will replace the existing Marion Franklin and Tuttle swimming pools |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Columbus |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Government, Automotive, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
