Tuxtla Gutierrez - San Cristobal de las Casas Highway Expansion
Sector: Mass Transit • Location: Mexico
Source: World Bank Group
The highway is located in Chiapas, Mexico and has length of 61.5KM. It will be expanded with the construction of three new lanes. The operating speed will be increased to more than 60 km / h to reduce travel times and reduce vehicle operating costs . Among other scopes of the work, it will be extended to a third lane in 29 kilometers to serve 21 conflict points, four bridges will be expanded, 9 PI
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The highway is located in Chiapas, Mexico and has length of 61.5KM. It will be expanded with the construction of three new lanes. The operating speed will be increased to more than 60 km / h to reduce travel times and reduce vehicle operating costs . Among other scopes of the work, it will be extended to a third lane in 29 kilometers to serve 21 conflict points, four bridges will be expanded, 9 PIVs modernized, three emergency ramps and the San Cristóbal junction. Ainda and construction group Aldesa will invest Ps$ 951 million ($43.3 million) in Concesionaria de Autopistas del Sureste (CAS). Ainda will hold 51% of the concessionaire and Aldesa, a 49% stake. Grupo Aldesa is now controlled by CRCC International Investment Group (CRCCII), a wholly-owned subsidiary of China Railway Construction Corporation Limited (CRCC). Total project cost is Ps$ 951 million ($43.3 million). Financial close was achieved on 13 August 2020. Construction started in December 2020. Work will be completed in December 2022, when the highway will begin operating. https://ijglobal.com/articles/149678/mexican-road-reaches-fc https://www.dineroenimagen.com/alicia-salgado/acuerdo-de-inversion-de-lopez-obrador-funciono/125748 |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
