TVS Energy (Maharashtra) Limited_25.5MW Windfarm

Sector: Commercial • Location: India

Source: World Bank Group

Project
Active

In 2011, TVS Energy Limited entered into an agreement with Maharashtra Government to develop a 25.5MW wind farm located at Satara and Sangli districts (spread across 5 villages- Vibhutwadi, Kurundwadi, Kaledhon, Mulikwadi and Panchwad), in the state of Maharashtra. The windfarm would involve the building of 17 Vensys V82 wind turbines of 1500KW capacity each. The windfarm was designed at a load fa

Project Information FAQ

Project Information

5 Q
The project “TVS Energy (Maharashtra) Limited 25.5MW Windfarm” is an infrastructure initiative in the Commercial sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In 2011, TVS Energy Limited entered into an agreement with Maharashtra Government to develop a 25.5MW wind farm located at Satara and Sangli districts (spread across 5 villages- Vibhutwadi, Kurundwadi, Kaledhon, Mulikwadi and Panchwad), in the state of Maharashtra. The windfarm would involve the building of 17 Vensys V82 wind turbines of 1500KW capacity each. The windfarm was designed at a load factor of 22.83%. The electricity generated from the project would be evacuated to Northern, Eastern, Western and North-Eastern grid of India. The WEGs were connected to the transformer (33 kV/690 V) at yard and this in turn would be fed to the pooling substation (220 kV / 33 kV). ReGen Powertech Private Limited signed a supply and operation and maintenance contract for the project in August 2011. For the first 3 years after COD, O&M would be not chargeable to TVS Energy. Renewable Energy Generation Private Limited was contracted for the erection and commissioning of the WEGs in August 2011. TVS Energy Maharashtra Windfarm would sell the power to Maharashtra State Electricity Distribution Company Ltd (MSEDCL) through a 13-year PPA. The APPC (Average Power Purchase Cost) base tariff as per MERC tariff order (dated 29 April 2011 for Wind zone 1) was US$ 0.10/Unit (INR 5.37 per unit @53.44 INR/USD) for the first 13 years of operation. The transmission charges would be paid by TVS Energy to the state transmission utility.The total capacity of 25.5MW was eligible under GBI scheme (incentive of INR 0.5/kWh) and CDM benefits under UNFCC and validation process had been completed for CDM benefits. Financial closure took place on 28th September 2011.The total project cost at the time of financial closure was US$ 35.1mn (INR 1640mn @46.67 INR/USD).The debt equity ratio for the project was about 70/30. Financing comprised a 10-year term loan of US$ 24.6mn (INR 1148mn) and sponsor equity of US$ 10.5mn (INR 492mn). The term loan was arranged by ICICI. Land was acquired in March 2012. Pre-construction activities started in August 2011 and 2 WEGs had been commissioned by 31 March 2012. 4 WEGs were commissioned on 30 May 2012 and the last 11 WEGs had been commissioned on 17 September 2012.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data