TWD Water Sector Phase 2 - System Consolidations
Sector: Water Supply and Storage • Location: Hammond, Louisiana, United States of America
Source: Dodge
The project involves the construction of new 6", 8", 10", 12", and 16" water mains, including approximately 32,000 linear feet of 6"/8" PVC (PR-160) water mains, 3,300 linear feet of 10" PVC (PR-160) water mains, 5,200 linear feet of 12" PVC (PR-160) water mains, and 1,000 linear feet of 16" PVC (PR-160) water mains. It also includes about 7,000 linear feet of directionally bored, jacked, and bore
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Government
- Location
- Hammond, Louisiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TWD Water Sector Phase 2 - System Consolidations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the construction of new 6", 8", 10", 12", and 16" water mains, including approximately 32,000 linear feet of 6"/8" PVC (PR-160) water mains, 3,300 linear feet of 10" PVC (PR-160) water mains, 5,200 linear feet of 12" PVC (PR-160) water mains, and 1,000 linear feet of 16" PVC (PR-160) water mains. It also includes about 7,000 linear feet of directionally bored, jacked, and bored water mains. The scope further includes locating and tying in existing water mains to new water... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Louisiana |
City | Hammond |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
