Twin Lane Road Improvements
Sector: Water Supply and Storage • Location: Sun Prairie, Wisconsin, United States of America
Source: Dodge USA
The project includes rehabilitation of approximately 11,264 LF of roadway. Roadway rehabilitation work includes the addition of gravel base over the existing pavement structure prior to pulverizing, regrading of gravel base and pulverized pavement, proof roll of roadway base and any required undercut, and placement of new asphaltic pavement and shoulders. Project work also includes ditch grading,
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial)
- Location
- Sun Prairie, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Twin Lane Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes rehabilitation of approximately 11,264 LF of roadway. Roadway rehabilitation work includes the addition of gravel base over the existing pavement structure prior to pulverizing, regrading of gravel base and pulverized pavement, proof roll of roadway base and any required undercut, and placement of new asphaltic pavement and shoulders. Project work also includes ditch grading, culvert replacements, necessary driveway replacements, and associated erosion control and restora... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Sun Prairie |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
