Two Rivers Wind Project - 280 MW
Sector: Wind • Location: Medicine Bow, Wyoming, United States of America
Source: Dodge USA
Two Rivers Wind LLC, is a joint venture partnership between BluEarth Renewables US LLC and Clearway Energy Group LLC. The project will consist of wind turbines, a substation, electrical collector systems and roads, and 230 kv transmission lines to the point of interconnection. Expected Capacity - Up to 280 MW, Preliminary Site Plan - Up to 38 wind turbines on Two Rivers Ranch
- Status
- Prospective
- Sector
- Wind, Hospital, Power Transmission, Power Generation (CCGT), Road, Hotel, Commercial
- Location
- Medicine Bow, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Two Rivers Wind Project - 280 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Two Rivers Wind LLC, is a joint venture partnership between BluEarth Renewables US LLC and Clearway Energy Group LLC. The project will consist of wind turbines, a substation, electrical collector systems and roads, and 230 kv transmission lines to the point of interconnection. Expected Capacity - Up to 280 MW, Preliminary Site Plan - Up to 38 wind turbines on Two Rivers Ranch |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wyoming |
City | Medicine Bow |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Wind, Hospital, Power Transmission, Power Generation (CCGT), Road, Hotel, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Wind projects in United States of America
- NTIA Tribal Broadband Connectivity Program
- Pump Station 3 Replacement
- Reston Town Center Expansion
- 108th Avenue Northeast transit queue jump
- 4520 Barrett Road Tentative Parcel Map and Abandonment
- Abandonment Of Portions Of An I.O.D. And P.U.E. Located Within 4110 Winding Bluff Lane
- Whisper Wind Temporary Hardship Mobile Home
- 4450 Manzanita Ave (Winding Ranch) Pre Application Meeting
