TX/DOT: Bridge Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
BRIDGE REPLACEMENT - COLEMAN CO COLEMAN CR 0923-08-028 BR 2023 (710) 0923-08-035 BR 2023 (744) CR 108 AT MUD CREEK BRANCH LENGTH: 0.10 MILES CR 154 AT BETTY LOGAN CREEK LENGTH: 0 MILES
- Status
- Prospective
- Sector
- Commercial, Road, Bridge
- Location
- Brownwood, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TX/DOT: Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | BRIDGE REPLACEMENT - COLEMAN CO COLEMAN CR 0923-08-028 BR 2023 (710) 0923-08-035 BR 2023 (744) CR 108 AT MUD CREEK BRANCH LENGTH: 0.10 MILES CR 154 AT BETTY LOGAN CREEK LENGTH: 0 MILES |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Brownwood |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Bridge |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
