TX/DOT: Construct Pedestrian Infrastructure
Bidding · Texas · Last reported Nov 2026
Source: Dodge
Sidewalk/Parking Lot. Bids to Owner Public - State December 02 at 01:00 PM (CST)
- Status
- Prospective
- Sector
- Power Generation (CCGT), Power Transmission, Road, Manufacturing (Industrial), Telecommunications, Automotive
- Location
- Wharton, Texas, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TX/DOT: Construct Pedestrian Infrastructure
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Sidewalk/Parking Lot. Bids to Owner Public - State December 02 at 01:00 PM (CST) |
Original sector | Transport |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Wharton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Power Transmission, Road, Manufacturing (Industrial), Telecommunications, Automotive |
Article published date | 2026-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
