logo
ProjectPre-Design

TX/DOT: Holly Road New Shared-use Path & Pedestrian Bridge

One of 10,000+ projects Taiyo tracks in Texas.

Source: Dodge USA

The project will construct a 15-foot-wide shared-use path and a new pedestrian bridge across Oso Bay. The project will renovate the existing train trestle bridge and connect the Holly Road and Flour Bluff Drive shared-use paths.

Status
Prospective
Sector
Rail, Car parking, Bridge, Road, Automotive, Commercial
Location
Corpus Christi, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about TX/DOT: Holly Road New Shared-use Path & Pedestrian Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TX/DOT: Holly Road New Shared-use Path & Pedestrian Bridge” is an infrastructure initiative in the Rail sector, located in Corpus Christi, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will construct a 15-foot-wide shared-use path and a new pedestrian bridge across Oso Bay. The project will renovate the existing train trestle bridge and connect the Holly Road and Flour Bluff Drive shared-use paths.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Corpus Christi

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Rail, Car parking, Bridge, Road, Automotive, Commercial

Article published date

2024-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project