TX/DOT: I-35 NEX Central Project: Segment 2
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project consists of approximately 9.5 miles of non-tolled improvements along I-35 from I-410 North to FM 3009 in San Antonio. The I-35 elevated lanes will provide direct connections to I-410 North and Loop 1604 West and East. The project also inc
- Status
- Closed
- Sector
- Commercial, Road, Manufacturing (Industrial)
- Location
- San Antonio, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TX/DOT: I-35 NEX Central Project: Segment 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of approximately 9.5 miles of non-tolled improvements along I-35 from I-410 North to FM 3009 in San Antonio. The I-35 elevated lanes will provide direct connections to I-410 North and Loop 1604 West and East. The project also inc |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | San Antonio |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Manufacturing (Industrial) |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
