TX/DOT: IH 10 Lanes Reconstruct
Planning schematics · Texas · Last reported Apr 2024
Source: Dodge USA
Reconstruct existing main lanes from IH 45 to Height Blvd and reconstruct existing HOV lanes from IH 45 to Studemont St to raise roadway above the floodplain and construct a new shared use path along White Oak Bayou
- Status
- Prospective
- Sector
- Road, Commercial, Manufacturing (Industrial)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about TX/DOT: IH 10 Lanes Reconstruct
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Reconstruct existing main lanes from IH 45 to Height Blvd and reconstruct existing HOV lanes from IH 45 to Studemont St to raise roadway above the floodplain and construct a new shared use path along White Oak Bayou |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial) |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
