logo

TX/DOT: IH 30 Highway Widening

Sector: Road • Location: New Boston, Texas, United States of America

Source: Dodge

Project
Planning Schematics

US 82 From Fm 1840 To SH 98 Reconstruct 2 Lane Rural Roadway To Provide Passing Lanes from SH-98 to 0.4 MI S of IH-30 LIMITS FROM SH 98 LIMITS TO 0.4 MI S OF IH 30

Status
Prospective
Sector
Road, Commercial
Location
New Boston, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about TX/DOT: IH 30 Highway Widening

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TX/DOT: IH 30 Highway Widening” is an infrastructure initiative in the Road sector, located in New Boston, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

US 82 From Fm 1840 To SH 98 Reconstruct 2 Lane Rural Roadway To Provide Passing Lanes from SH-98 to 0.4 MI S of IH-30 LIMITS FROM SH 98 LIMITS TO 0.4 MI S OF IH 30

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

New Boston

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Commercial

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project