logo

TX/DOT: SH 107 Non-Freeway Widening (FM 1924 North - FM 676)

Sector: Road • Location: Alton, Texas, United States of America

Source: Dodge

Project
Planning Schematics

SH 107 Widen from 4 Lane to 6 Lane Divided Urban Reconstruction and widening of an existing non-freeway facility from a 4-lane divided rural with grass median to a 6-lane divided urban with raised median.

Status
Prospective
Sector
Road, Manufacturing (Industrial), Commercial
Location
Alton, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about TX/DOT: SH 107 Non-Freeway Widening (FM 1924 North - FM 676)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TX/DOT: SH 107 Non-Freeway Widening (FM 1924 North - FM 676)” is an infrastructure initiative in the Road sector, located in Alton, Texas, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SH 107 Widen from 4 Lane to 6 Lane Divided Urban Reconstruction and widening of an existing non-freeway facility from a 4-lane divided rural with grass median to a 6-lane divided urban with raised median.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Alton

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Road, Manufacturing (Industrial), Commercial

Article published date

2025-02-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project