TX/DOT: US 69 Traffic Control Services
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
US 69 Traffic Control Services PROJECT DESCRIPTION: Perform temporary traffic control by providing flaggers, pilot car with operator, and truck mounted attenuator (TMA) with operator to assist State forces in maintenance activities on various state-maintained roadways within the Grayson County.
- Status
- Closed
- Sector
- Automotive, Road, Commercial
- Location
- Bells, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about TX/DOT: US 69 Traffic Control Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | US 69 Traffic Control Services PROJECT DESCRIPTION: Perform temporary traffic control by providing flaggers, pilot car with operator, and truck mounted attenuator (TMA) with operator to assist State forces in maintenance activities on various state-maintained roadways within the Grayson County. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Bells |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Automotive, Road, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
