logo
ProjectPlanning Schematics

TX/DOT: US 77 Intersection Improvements

Sector: Commercial • Location: Riviera, Texas, United States of America

Source: Dodge USA

The project will construct a 4-lane divided freeway relief route on new location around Riviera. (Riviera Relief Route)(FUTURE I-69 CORRIDOR).Highway US 77 From Limit 1.5 MI N. OF SH 285 INTERSECTION To Limit KENEDY/KLEBERG COUNTY LINE

Status
Prospective
Sector
Commercial, Manufacturing (Industrial), Road
Location
Riviera, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about TX/DOT: US 77 Intersection Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “TX/DOT: US 77 Intersection Improvements” is an infrastructure initiative in the Commercial sector, located in Riviera, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will construct a 4-lane divided freeway relief route on new location around Riviera. (Riviera Relief Route)(FUTURE I-69 CORRIDOR).Highway US 77 From Limit 1.5 MI N. OF SH 285 INTERSECTION To Limit KENEDY/KLEBERG COUNTY LINE

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Riviera

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Manufacturing (Industrial), Road

Article published date

2024-12-23

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project